Internal Works:
Remove and dispose of carpet floor tiles
Remove and dispose of 1 window to 4th floor for access
Remove and dispose 115m2 plasterboard ceilings
Remove and dispose of 2 water tanks
Roof works:
Remove and dispose of 3 layers of felt and 1 layer of insulation to expose concrete screed.
Manually break out concrete screed to reveal RAAC system
Manually break out RAAC system and dispose off site